Strategic project management

Strategic project management that maps every project to the goal it moves, and flags the ones that no longer do.

Vindaris maps your strategy, goals and projects into one Work Graph, then analyzes the work activity across Jira, Slack, HubSpot and Asana: projects with no goal above them, effort going into work no goal asked for, and goals with no project behind them. It flags the projects that stopped moving a goal while there is still time to act.

Vindaris sits above your project tools, so each project carries the goal it serves and the work delivering it, down to the task and the Slack thread.

Free up to 5 users Two integrations free No credit card required
Work Graph KPI at risk
Key Result Activation rate to 40% is at risk - 3 teammates shipping, owner idle 9 days.
Work Graph Tasks waiting for alignment
7 tasks have been waiting to be linked to a Key Result - or marked as BAU.
Built by the strategy execution experts trusted by:
Quick answer

What is strategic project management?

Strategic project management is managing projects in service of strategy: every project exists to move a goal, and the portfolio is judged on whether it does. Most project tools track tasks and dates. What they rarely show is whether a project still serves the strategy it was started for.

What makes project management strategic?

A project is strategic when it maps to a goal and that link stays live. Vindaris ties each project to the goal it moves and analyzes the work activity behind it, so a project that stopped moving its goal shows up on the portfolio view.

How do you align projects with strategy?

Map each project to the goal it serves. Vindaris then flags projects with no goal above them and goals with no project behind them, so the gaps between the plan and the portfolio are visible before the review.

Does Vindaris replace Jira or Asana?

No. Vindaris sits above your project tools, not in place of them. Your teams keep working in Jira, Asana and Planner, and Vindaris traces the task activity from them to manage the portfolio at the strategy level.

How do you manage a project portfolio strategically?

Judge the portfolio on the goals it moves. Vindaris ranks projects by the goals they move and flags the ones consuming effort without moving one, so leadership can cut or re-aim them before the quarter ends.

Vindaris Alignment Canvas showing an OKR cascade from company Objectives down to Key Results, projects and tasks, with at-risk work flagged in red Click thru live demo Pre-built workspace. No signup.

The whole cascade on one board: Objectives at the top, Key Results beneath them, and the projects and synced tasks doing the delivering. Click through the live workspace, no signup.

Use cases

Grade the OKRs you already wrote.

OKRs rarely fail at the quarterly grading. They fail in the weeks between, when nobody notices the work behind a Key Result has gone quiet.

My Priorities showing one person's Objectives, Key Results and connected tasks for the week
My PrioritiesEach person's Objectives, Key Results and connected tasks, ordered by impact and due date.
Work Graph alert listing Key Results with no movement since the start of the quarter
Work GraphThe check most OKR programs skip, run automatically.
Data Studio comparing previous-quarter Key Results against their actual throughput
Data StudioQuery every goal, KPI, project and task like a database.
Heatmap showing Objectives shaded by delivered Key Result progress at grading
HeatmapA tile per team, person or Objective, shaded by progress against plan.
Alignment Canvas keeping Objectives intact through an organizational change
Alignment CanvasCards for Objectives, Key Results, projects and tasks on an open canvas.
The platform

One connected system, from the Objective down to a single task.

Objectives and the work delivering them do not live in separate tools that someone reconciles every Friday. In Vindaris they share one model, so a closed ticket moves the Key Result above it without anyone touching the Key Result.

01 / Connected model

Objectives and work in one graph

Objectives, Key Results, projects and tasks connect on an open canvas with no enforced goal syntax. Cascade from company level to a single contributor, or keep it flat.

02 / Single owner

One name against each Key Result

Shared Key Results are where OKR programs quietly fail: when three people own a number, nobody answers for it. Vindaris enforces one owner and tracks contributors separately, so accountability survives the quarter.

03 / Two-way sync

Work stays where it lives

Connect HubSpot, Jira, Planner, Asana and Google Tasks, then hang them under a Key Result. Sync runs both directions, so engineering keeps Jira and the Objective still knows what closed.

Step 01 | Alignment Canvas

Define your Objectives and Key Results

Write your OKRs in the strategy narrative or build them directly on the Alignment Canvas. Cascade from company level down to teams and individuals. The structure is yours to define.

  • No enforced hierarchy. One Key Result can serve two Objectives.
  • Rename every level to match the language your company already uses.
Alignment Canvas: define your objectives and key results
Step 02 | Task Board

Connect the tools your Key Results are delivered in

Plug in HubSpot, Microsoft Planner, Google Tasks, Asana or Jira. The tasks that move a Key Result arrive with their owners attached, so the OKR knows who is behind it as well as how far along it is.

  • A task closed in Jira closes in Vindaris, and back again.
  • Every synced task keeps a tag pointing at its source tool, so a Key Result can always be audited back.
Task Board: connect the tools your key results are delivered in
Step 03 | My Priorities

Map tasks to Key Results

Vindaris suggests which tasks and projects connect to each Key Result based on labels, owners and structure. Confirm the mapping, adjust what it got wrong, and every contributor gets a ranked list of what actually moves their numbers.

  • Suggestions come from the work, not from a naming convention.
  • Everyone sees their own slice ranked by what it affects upstream.
My Priorities: map tasks to key results
Step 04 | Work Graph

Get alerted when Key Results are at risk

The Work Graph continuously evaluates task progress behind each Key Result. When work stalls or pace falls off, the owner is notified with the blocking work named, weeks before a check-in would have caught it.

  • Alerts for OKRs, each with the blocking work named.
  • Scheduled AI summaries land in Slack, Teams or email.
Work Graph: get alerted when key results are at risk
Progress tracking

Progress tracking from plan through delivery.

Run Vindaris as OKR tracking software for a single team or as OKR management software for a whole organisation. The cycle is the same either way: draft, cascade, track through the quarter, and grade at the end against what the work actually produced.

Draft the quarter, then cascade it or keep it flat

Write Objectives and Key Results on the canvas with no enforced syntax, then cascade from company level down to teams and individuals, or leave the structure flat. One Key Result can serve two Objectives, and every level can be renamed to the language your company already uses.

How to track OKRs without maintaining a second system

Each Key Result is derived from the tasks delivering it, so tracking happens as a by-product of the work. This is the practical answer to how to track OKRs at any size, from a five-person team to a program with hundreds of Key Results.

Grade against the work, not against memory

At the end of the cycle the score reflects what the work produced, with the history of how it got there still attached. Score your drafts before the quarter starts with the free OKR Quality Grader, or run a cycle in the Excel OKR tracker first if you would rather try the shape before adopting an OKR platform.

OKRs alongside the frameworks the rest of the company runs

One workspace can hold OKRs for the product organisation and EOS Rocks for the leadership team, next to KPIs and SMART goals. That matters the moment one part of the company stops running OKRs, which is when a single-framework tool becomes a migration.

Try step 01

Write the quarter in plain language, get a cascade.

Describe the Objectives you just set the way you would say them out loud. Mention an Objective, Key Result, project or task with @ and Vindaris maps it onto the Alignment Canvas.

Strategy Narrative
Write your @strategy, @goals, @kpis, @projects and @tasks and automatically map them on the Alignment Canvas in one click. Type @ to mention
Mention existing
expand into the European enterprise market
grow ARR to $10M
land 25 enterprise logos
build a repeatable outbound motion
launch the partner & referral program
hire two enterprise account executives
Create new
New Goal…
New KPI…
New Project…
New Task…
Start from an example:
Risk alerts

Risk alerts, in progress terms.

The Work Graph traces the links between each Key Result and the tasks delivering it. These are the ones that fire most often on an OKR program.

Work Graph alert showing a Key Result behind pace and the stalled task causing it
Work GraphNames the Key Result, the pace gap and the specific task that caused it.
Alignment Canvas showing tasks with no Objective above them flagged as orphans
Alignment CanvasOrphaned work is visible on the canvas the week it appears.
Heatmap showing a Key Result tracking well ahead of plan
HeatmapSandbagged targets are as expensive as missed ones, and easier to fix.
Data Studio view showing a KPI that cannot be reached at the current rate
Data StudioCalculated from work throughput, not from a confidence rating.

Deterministic and AI-driven alerts that flag slipping work and misaligned focus.

Built for the way you work

Your framework, your language, your data in Europe.

Vindaris adapts to the OKR practice you already run, including the parts most tools argue with: shared Key Results, mid-quarter changes, and teams that score differently from each other.

Runs OKRs without locking you into them

Vindaris ships without a prescribed methodology, so Objectives and Key Results keep their names and their relationships. One workspace can hold OKRs for the product organization alongside EOS Rocks for the leadership team, which matters the moment one part of the company stops running OKRs.

OKRs EOS OGSM KPIs SMART Goals Hoshin Kanri
Pricing

Free forever, including two integrations.

Free covers a full OKR program: full Objectives, Key Results, KPIs, tasks and projects for up to 5 people. Pay when you add people, integrations or AI summaries.

Free
€0/forever

Best for individual contributors, small teams or startups. No credit card required.

  • All views: Canvas, My Priorities, Heatmap, Data Studio and Task Board
  • Two integrations of your choice
  • Up to four additional members
  • Five ad-hoc AI risk summaries per month
Sign up for free
Pro
€20/user/mo

Best for multiple teams, exec teams, Chiefs of Staff or full-org deployments.

  • Everything in Connect
  • Unlimited users in one organization
  • Direct human support, 24h response
  • Human-led onboarding
Start with Pro

See full plan comparison →

Free tooling

Grade the OKRs you already wrote.

Real Excel and PowerPoint files, plus browser tools that run without an account. Useful whether you adopt Vindaris or keep running OKRs in a spreadsheet.

Frequently asked questions

Common questions, answered

What is strategic project management?

Strategic project management is managing projects so each one moves a goal, and judging the portfolio on whether it does. Vindaris maps each project to the goal it serves and analyzes the work activity behind it, so you always know whether a project is still moving its goal.

How do you keep projects aligned to strategy?

A project aligns to strategy when it maps to a goal and the mapping is kept current. Vindaris flags projects with no goal above them and goals with no project behind them, so leadership sees where the portfolio and the strategy have come apart.

Can Vindaris track OKRs and KPIs together?

Yes. Vindaris supports OKRs, KPIs, Balanced Scorecard, OGSM, and other frameworks in one platform. You can run KPIs alongside OKRs and see how both roll up to the same work.

How is Vindaris different from other OKR tools?

Most OKR tools track goals in isolation. Vindaris maps goals to traceable work, so tasks, projects and deliverables live in the same system. It is free forever for goal and strategy management, hosted in Germany, and GDPR compliant.

What is the best OKR software for a small team?

The right OKR software for a small team is one that does not need an administrator. Vindaris is free for up to five people with two integrations, sets up in an afternoon, and connects Key Results to the tasks already running in your tools so nobody has to maintain a second system. For a comparison of the wider market, our independent review of the best OKR software covers eleven platforms.

Is Vindaris free OKR software?

Yes, free forever for up to five people, including the full canvas and two integrations, with no credit card. Startups typically run their first several quarters entirely on the free plan. Paid plans start when you add more people, more integrations or unlimited AI summaries.

How do you track OKRs without weekly check-ins?

Link each Key Result to the tasks and projects delivering it, and Vindaris derives its progress from the work closing. Check-ins still have value for context and decisions, but the number no longer depends on them, so a skipped week does not leave a stale dashboard behind.

Does Vindaris sync with Jira and Asana?

Yes, in both directions. Vindaris syncs with Jira, Asana, HubSpot, Microsoft Planner, Google Tasks, Microsoft To Do, Slack and Teams. A ticket closed in Jira moves the Key Result above it in Vindaris, and a comment written in Vindaris reaches the owner inside the tool they already use. No team has to migrate.

Why do OKRs fail after the first quarter?

Usually because the Objectives and the work sit in separate tools between plannings. The quarter opens with a good set of OKRs, the work happens somewhere else, and by week three nobody can say which task moves which Key Result. The grading at the end then measures what people remember. Deriving each Key Result from the tasks that moved it is what keeps the second quarter from being a relaunch.

Get started

Know which projects stopped moving a goal while there is still time to act.

Connect your first tool in 90 seconds. Free forever for OKR management.

Start tracking OKRs free

No credit card | No migration | No minimum contract